hoodoo
01-30-2003, 10:18 AM
Hi all,
I have an m105 with OS v. 3.5.2 update
I have a repeating schedule item (weekly hockey!) entered, and I change the individual times of the games as they are released. I have preset the time to 9pm-10pm. Yesterday, I updated an individual repeating occurence to 11:30pm-12:30am, and when I synced (with Outlook), all repeating occurrences on the m105 were lost, except for the single updated event, but were retained on Outlook. I then changed the time to 11:30pm to 11:59pm, re-synced, and all of the repeats were restored!!
Is this a known problem (i.e. repeating item over midnight) with OS 3.5 and is this fixed for 4.1? Or just a date book prob for everybody?
Thx in advance...
I have an m105 with OS v. 3.5.2 update
I have a repeating schedule item (weekly hockey!) entered, and I change the individual times of the games as they are released. I have preset the time to 9pm-10pm. Yesterday, I updated an individual repeating occurence to 11:30pm-12:30am, and when I synced (with Outlook), all repeating occurrences on the m105 were lost, except for the single updated event, but were retained on Outlook. I then changed the time to 11:30pm to 11:59pm, re-synced, and all of the repeats were restored!!
Is this a known problem (i.e. repeating item over midnight) with OS 3.5 and is this fixed for 4.1? Or just a date book prob for everybody?
Thx in advance...